A bottle-rinser pre-start check proves that the correct format, utility, safety and acceptance conditions are in place before bottles are released.
Complete the check after installation, cleaning, maintenance or format change, and whenever the site's approved procedure requires it. Confirm line clearance, installed change parts, nozzle and holder condition, utilities, drainage or extraction, guards and interlocks, recipe/settings, first-off bottle presentation, coverage and downstream condition. Record the result and the person authorised to release production.
The checklist should be adapted to the actual machine instructions and site risk assessment. It is not permission to access guarded areas or work on energised equipment.